The UK nuclear industry is predicted to generate just under 5 million tonnes of radioactive waste across its entire lifetime. A small fraction of this, about 6%, will remain radioactive for millennia, which means that a long-term plan is required for managing new nuclear waste as well as the long-lived waste already being stored in […]
![Power plant](https://blog.policy.manchester.ac.uk/wp-content/uploads/2019/05/Untitled-design-18.png)